GR | EN
WITH THE SUPPORT
Photo Gallery
Upgrade of the DTird system at CRES demonstration Wind farm at Keratea, Attica
Photos from the upgrade of the DTBird system at CRES Wind farm in April 2020. The system is installed at NEG Micon 750 kW wind turbine, with a tower height of 45 m.
«   ... 5  6