GR | EN
WITH THE SUPPORT
Photo Gallery
Installation of the Bat Detector NEG MICON 48/750 kW WT at PENA-CRES Wind Farm
Installation of the Pettersson D500X MkII Bat Detector, June 2016.
Installation of a Bat Detector system at VESTAS V4/660kW WT at PENA-CRES Wind Farm
Installation of the BATLOGGER C -Ålekon AG at VESTAS V47/660kW wind turbine, PENA -CRES Wind Farm, Keratea
«    1  2  3  4 ...   »